Posted on 6/2/2009 with 0 comments
http://www.nytimes.com/gwire/2009/06/01/01greenwire-senate-panel-to-tackle-renewables-standard-bui-70693.html?pagewanted=1
New nuclear would not be included in the total baseline from which the RPS would be calculated.
Name (required)
Mail (will not be published) (required)
Website
» Leave a reply «